Lane Reductions on Shediac Road Locations: Between Vista Drive and McAuley DriveBetween Glengrove Road and Harrisville BoulevardDate: Tuesday, July 2 to Friday, July 12Time: 7 a.m. to 7 p.m.Work details: Street microsurfacing is taking place on these sections of road.Traffic impact: Road will be reduced to one lane of traffic in each direction for the duration of the work. Signage and flaggers will be in place to control traffic; delays are to be expected.